CONSTRUCTION OF 500 LITERS WATER CAPACITY TANK
Download Full Final Year Project Topic and Materials for FREE. This Project Material contains 63 pages and contains Chapters 1-5
Keywords: Project Topic, Final Year Project Topic, Download Free Project Topic Material, CONSTRUCTION OF 500 LITERS WATER CAPACITY TANK Project Topic and Materials
ABSTRACT
The purpose of this study is to investigate the water retaining behaviour of lightweight aggregate concrete and the effect of polypropylene fibres upon its addition in Lightweight Aggregate Concrete (LWAC) mix in the overhead water tank of 1000 gallons. The material was fabricated and tested under different conditions. The observations concluded that the behaviour of this material is very good in water retention and temperature control. Moreover, the unit weight of LWAC reduced to 1890 kg/m3 which is 21% less than NWAC which is of paramount importance. Furthermore, compressive strength and load bearing capacity of FLWAC was not compromised as evaluated during this academic study. It is observed that strength has increased by addition of polypropylene fibres and no leakage was there, even after the testing of large period no seepage has been seen, whereas the cost of the tank prepared by FLWAC Tank was found to be 18% to 20% less than the cost of NWAC. Thus it can be concluded that LWAC along with polypropylene fibres yielded impressive results and finally, it is concluded that this material can be used for future work such as construction of prefabricated U channels for storm water drainage in katchi abadies etc.
The purpose of this study is to investigate the water retaining behaviour of lightweight aggregate concrete and the effect of polypropylene fibres upon its addition in Lightweight Aggregate Concrete (LWAC) mix in the overhead water tank of 1000 gallons. The material was fabricated and tested under different conditions. The observations concluded that the behaviour of this material is very good in water retention and temperature control. Moreover, the unit weight of LWAC reduced to 1890 kg/m3 which is 21% less than NWAC which is of paramount importance. Furthermore, compressive strength and load bearing capacity of FLWAC was not compromised as evaluated during this academic study. It is observed that strength has increased by addition of polypropylene fibres and no leakage was there, even after the testing of large period no seepage has been seen, whereas the cost of the tank prepared by FLWAC Tank was found to be 18% to 20% less than the cost of NWAC. Thus it can be concluded that LWAC along with polypropylene fibres yielded impressive results and finally, it is concluded that this material can be used for future work such as construction of prefabricated U channels for storm water drainage in katchi abadies etc.
Download Full Project
Download
Get the complete project document.
Source: https://www.iprojectmaster.com/agricultural-science/final-year-project-materials/construction-of-500-liters-water-capacity-tank
Related Project Topics
All Project Topics
📂 Browse by Department
- Geography
- Education
- Forestry & Wildlife
- Medicine
- Human Resource Management
- Secretarial Studies
- Environmental Science
- Human Kinetics
- Political Science
- Office Technology
- Fine & Applied Arts
- Library Science
- Public Health
- Tourism & Hospitality
- Urban & Regional Planing
- Religious & Cultural Studies
- Theatre Arts
- Social Studies
- Veterinary
- Quantity & Surveying
- African Languages
- Micro Biology
- Guidance and Counseling
- Educational Technology
- Petroleum Engineering
- Architecture
- Applied Science
- Business Administration
- Physics
- Agricultural Extension
- International Relations
- Vocational Studies
- Law
- Chemical Engineering
- Computer Science Education
- Animal Science
- English
- Civil Engineering
- Accounting Education
- Physiology
- Marketing
- Estate Management
- New Project Topics
- Adult Education
- Geology
- Purchasing & Supply
- Science Labouratory
- Chemistry
- Public Administration
- Curriculum Studies
- Accounting
- Mathematics Education
- Computer Science
- Business Management
- Project Management
- Computer Engineering
- Statistics
- Home Economics
- Mechanical Engineering
- Information Technology
- Economics
- Electrical & Electronics
- Brewing Science
- Philosophy
- Soil Science
- Marine and Transport
- Fishery & Aquaculture
- Business Education
- Criminology
- Building and Technology
- Final Year Project Topic
- French
- Production & Operations Mgt
- Industrial Chemistry
- Mass Communication
- Commerce
- Biblical and Theology
- History
- Pharmacy
- Biology
- Biochemistry
- Entrepreneurship
- Agricultural Science
- Anatomy
- Islamic & Arabic Studies
- Sociology
- Insurance
- Actuarial Science
- Food Science & Tech
- Health & Sex Education
- Zoology
- Industrial & Relations Personnel Management
- Nursing
- Psychology
- Banking and Finance