PRODUCTION CONTROL SYSTEM (A CASE STUDY OF 7UP BOTTLING COMPANY)

๐Ÿ“‚ Computer Science ๐Ÿ“„ MS WORD ๐Ÿ“‘ 1-5 chapters ๐Ÿ“ƒ 67 pages ๐Ÿ‘๏ธ 242 views

Download Full Final Year Project Topic and Materials for FREE. This Project Material contains 67 pages and contains Chapters 1-5

Keywords: Project Topic, Final Year Project Topic, Download Free Project Topic Material, PRODUCTION CONTROL SYSTEM (A CASE STUDY OF 7UP BOTTLING COMPANY) Project Topic and Materials


ABSTRACT
The theme of the research work is production control system software, a case study ofย 7up bottling company. The objective of this work is to bring it to emphasis on a new system that will help improve production control system software in production companies The problem encountered during this research work project can be affected at factors. Problem encountered in this research work have been classified into technical and non-technical problem. The major problem encountered during the research work is the problem of inadequate material to provide enough used information about the bill of material used in Anammaco and their defailed analysis. Also, the non-technical problem encountered is the problem of time to necessary of information and acquiring necessary material used in Anammco. All these factors contributed to set back of this research work. Observation and analysis so far made in this research has clearly show that the importance of bill of materials and its study cannot be over emphasized. Finally, this program will help Anammco in keeping accurate records for their staff. It will also help them to reduce redundancy in their staff record stored in database.
Download Full Project

Get the complete project document.

Download

Source: https://www.iprojectmaster.com/computer-science/final-year-project-materials/production-control-system-a-case-study-of-7up-bottling-company

All Project Topics
๐Ÿ“‚ Browse by Department